VDB Willow Farm [RERA APPROVAL NO.PRM/KA/RERA/1251/446/PR/171015/000706 ]

abc13
On going

The convenience of a city with the serenity of a farm house

VDB Willow Farm has been created on a naturally sloping landscape, retaining a small island of teak trees and preserving the best of nature. VDB Willow Farm is yet inhabited by the serenity of the countryside and offers the best of two worlds – easy accessibility to the city as well as the tranquillity of an idyllic teak-wood retreat.   While in close proximity to Sigma Tech Park, ITPL, Whitefield Town, Forum Value Mall, international schools and hospitals, it’s also easily accessible from both Old Airport Road and Old Madras Road.

Designed by the noted architectural company, Zachariah Consultants,

VDB Willow Farm is set on a 7-acre charming wooded property in which just 70 units are coming up with three options – 22 Villas (5676 – 6065 sq.ft.), 32 Duplexes (3872 – 4285 sq.ft.) and 16 Simplexes ( 3578 – 3613 sq.ft.).   Villas – 4 bedrooms, home theatre, additional landscaped garden/courtyard & option to have a luxurious private pool. Duplexes – 3 bedrooms and study. Private gardens for ground floor. Simplexes – 3 bedrooms and study. Private gardens for ground floor.

  This project has premium specifications as mentioned below with their relevant links. Please do visit the relevant links which are mentioned below, to see for yourself what the quality levels of our products are:-

The Modular Kitchen being sourced from a German Company called Bauformat. –http://www.sea-group.in

D Line SS work for internal / External Railings –http://www.q-railing.com

Premium sanitary wares from Toto- http://in.toto.com

Bath-tubs from Roca – http://www.roca.in

Concealed Flush Systems from Geberit – http://www.geberit.in

Textured paints from SKK – http://www.skk.com.sg

While these are just the starters, the real thing is in the tasting. The real magic is in the silence.

Price:
Address:Vdb Willow Farm Nallurhalli Village, Siddapura Main Road, Whitefield, Bengaluru, Karnataka 560066
City:Bangalore
State:Karnataka
Zip:560066
MLS:
Square Feet:304920 Sq. Ft
Pool:Yes
Tagged Features

Additional Features

Home Summary

Specifications

FLOORING

Type A & B (Villas)

Type C (Duplex apartments)

Type D (Single level apartments)

Living & Dining

Italian marble / engineered marble / equivalent

Italian marble or equivalent

Italian marble or equivalent

Family

Hardwood Flooring

Engineered wood Flooring

Wooden laminate

M. Bedroom

Hardwood Flooring

Engineered wood Flooring

Wooden laminate

Guest Bedroom

Engineered wood

Wooden laminate

Wooden laminate

Children's Bedroom

Wooden laminate

Wooden laminate

Wooden laminate

Kitchen / Utility

Porcelain tiles

Porcelain tiles

Porcelain tiles

M. Toilet

Anti-skid porcelain tiles

Anti-skid porcelain tiles

Anti-skid porcelain tiles

Other Toilets

Anti-skid porcelain tiles

Anti-skid porcelain tiles

Anti-skid porcelain tiles

Servants' Room

Porcelain tiles

Porcelain tiles

Porcelain tiles

Servants' Toilet

Anti-skid ceramic tiles

Anti-skid ceramic tiles

Anti-skid ceramic tiles

Powder Room

Marble

Marble

Marble

Balconies

Vitrified tiles rustic series / Porcelain

Vitrified tiles rustic series / Porcelain

Vitrified tiles rustic series / Porcelain

Decks

Flame finished granite

Flame finished granite

WALL CLADDING

Type A & B (Villas)

Type C (Duplex apartments)

Type D (Single level apartments)

Above Kitchen Counter

Glazed tiles

Glazed tiles

Master Toilet

Designer tiles

Glass mosaic as per design

Glass mosaic as per design

Other Toilets

Ceramic tiles up to false ceiling

Ceramic tiles up to false ceiling

Ceramic tiles up to false ceiling

Servants' Toilet

Ceramic glazed tiles up to false ceiling

Ceramic glazed tiles up to false ceiling

Ceramic glazed tiles up to false ceiling

DOORS & WINDOWS

Type A & B (Villas)

Type C (Duplex apartments)

Type D (Single level apartments)

Main Door Frame

TW frame engineered to the width of the wall thickness with brass / SS Hardware

TW frame 5 x 3

TW frame 5 x 3

Main Door Shutter

Teakwood panelled

Teakwood panelled

Teakwood panelled

Internal Door Frame

HW frame 5 x 3

HW frame 5 x 3

HW frame 5 x 3

Internal Door Shutter

Polished MDF molded design

Polished MDF molded design

Polished MDF molded design

External Door Frames

HW frame engineered to the width of the wall thickness with brass / SS Hardware

HW frame 5 x 3

HW frame 5 x 3


External Door Shutter

Resin coated flush shutters / painted

Resin coated flush shutters / painted

Resin coated flush shutters / painted

Toilet Door Shutter

Resin coated flush shutters / painted

Resin coated flush shutters / painted

Resin coated flush shutters / painted

Window Frame

UPVC frames / 3 track with mosquito mesh

UPVC frames / 3 track with mosquito mesh

UPVC frames / 3 track with mosquito mesh

Window Shutter

UPVC with 5 min thick float glass

UPVC with 5 min thick float glass

UPVC with 5 min thick float glass

WALL FINISHES

Type A & B (Villas)

Type C (Duplex apartments)

Type D (Single level apartments)

Internal Walls

Premium emulsion paint

Premium emulsion paint

Premium emulsion paint

External Walls

As per architectural detail

As per architectural detail

As per architectural detail

Ceiling

Designer Wall

Designer tiles / paint / wallpaper as per design on one wall in the living or dining or family area

Designer tiles / paint / wallpaper as per design on one wall in the living or dining or family area

Designer tiles / paint / wallpaper as per design on one wall in the living or dining or family area

STAIRCASES

Type A & B (Villas)

Type C (Duplex apartments)

Type D (Single level apartments)

Internal

Flooring

Wood

Wood / Granite

Railing

Stainless steel with glass

Stainless steel with glass

Common

Flooring

Sadarhalli granite as per design

Sadarhalli granite as per design

Railing

MS

MS

ELECTRICAL

Type A & B (Villas)

Type C (Duplex apartments)

Type D (Single level apartments)

Fans

Living and Dining

Living and Dining

Living and Dining

Fan Point

Living, Dining, all Bedrooms & Kitchen

Living, Dining, all Bedrooms & Kitchen

Living, Dining, all Bedrooms & Kitchen

Geyser Point

Kitchen and all Toilets except Servants' Toilet

Kitchen and all Toilets except Servants' Toilet

Kitchen and all Toilets except Servants' Toilet

Telephone / Internet Point

Living and all Bedrooms

Living and all Bedrooms

Living and all Bedrooms

Cable TV Provision

Individual DTH

Individual DTH

Individual DTH

Backup Power

100%

50%

50%

Switches

Modular premium range

Modular

Modular

Air-conditioning Points

Split system for Living, Bedrooms, Family and Home Theatre

Split system for Living, Bedrooms & Family

Split system for Living, Bedrooms & Family


PLUMBING FIXTURES & FITTINGS

Type A & B (Villas)

Type C (Duplex apartments)

Type D (Single level apartments)

WC in all Toilets

Wall-mounted EWC with concealed cistern of Kohler or equivalent

Wall-mounted EWC with concealed cistern of Kohler or equivalent

Wall-mounted EWC with concealed cistern of Kohler or equivalent

WC in Servants' Toilets

EWC with cistern

EWC with cistern

EWC with cistern

Wash Basin in all Toilets

Porcelain wash-basin on granite counter

Porcelain wash-basin on granite counter

Porcelain wash-basin on granite counter

Servants' Toilet

Wash-basin

Wash-basin

Wash-basin

Toilet Fittings

Kohler or equivalent

Kohler or equivalent

Kohler or equivalent

Master Toilet

Glass partition with single lever divertor, rain shower &

bathtub

Glass partition with single lever divertor & rain shower

Glass partition with single lever divertor, rain shower &

bath tub

Kitchen Counter

Polished granite

Polished granite

Polished granite

Kitchen Sink

Premium branded stainless steel sink with drain board

Premium branded stainless steel sink with drain board

Premium branded stainless steel sink with drain board

Hot Water Connection

To shower and wash-basin in toilets, sink in Kitchen

To shower and wash-basin in toilets, sink in Kitchen

To shower and wash-basin in toilets, sink in Kitchen

Solar-heated Water

All toilets

All toilets

All toilets

LIFT

Type A & B (Villas)

Type C (Duplex apartments)

Type D (Single level apartments)

Type

Individual lift / Levitator

1 common lift for each wing

1 common lift for each wing

SECURITY & SAFETY

Type A & B (Villas)

Type C (Duplex apartments)

Type D (Single level apartments)

Terminal & Main System

Each home is provided a colour touchscreen console connected to a central terminal as part of the home automation system

Each home is provided a colour touch screen console connected to a central terminal as part of the home automation system

Each home is provided a colour touch screen console connected to a central terminal as part of the home automation system

Burglar Alarm

Provision for burglar alarm system

Provision for burglar alarm system

Provision for burglar alarm system

Main Door Camera

Colour door camera at the front door

Colour door camera at the front door

Colour door camera at the front door

Main Door Lock

Sensor-based or bio-metric proximity card-based door lock to help you control the front door through the home automation console

Sensor-based or bio-metric proximity card-based door lock to help you control the front door through the home automation console

Sensor-based or bio-metric proximity card-based door lock to help you control the front door through the home automation console

Curtain Control System

The curtains in the formal Living area will have a motorized system with remote control

The curtains in the formal Living area will have a motorized system with remote control

The curtains in the formal Living area will have a motorized system with remote control

Magnetic Sensors

Provided for the front door and all out-facing windows

Provided for the front door and all out-facing windows

Provided for the front door and all out-facing windows

Gas-leak Detector

Provided in Kitchen

Provided in Kitchen

Provided in Kitchen

Occupancy Sensors

Main lights in the M. Bathroom will be controlled by occupancy sensors

Main lights in the M. Bathroom will be controlled by occupancy sensors

Main lights in the M. Bathroom will be controlled by occupancy sensors


ACCESSORIES

Type A & B (Villas)

Type C (Duplex apartments)

Type D (Single level apartments)

Cabinets in Kitchen

Modular Kitchen

Modular Kitchen

Modular Kitchen

Wardrobe

Bedrooms

Bedrooms

Bedrooms

Domestic Equipment

Chimney, 4-burner Hob, dishwasher

Chimney, 4-burner hob, dishwasher

Chimney, 4-burner hob

Toilets

Mirror with ply backing and edge trim

Mirror with ply backing and edge trim

Mirror with ply backing and edge trim

ADDITIONAL FEATURES

AC in all bedrooms

Piped gas connection from utility to kitchen

CCTV provision at main security, entry and exit from basements, lobbies and periphery of the development

Centralized Vaccum System for Villas

Courtyard and pebble court in Villas

Rainwater harvesting

Hydro Pneumatic System for water pressure

Sewage treatment plant

Water purification plant

Large and exclusive clubhouse with features like table tennis and billiards facilities, fully-equipped gym, badminton and squash courts, children's play area and swimming pool


VDB Home Care.

Our Promise

VDB Home Care. Our commitment towards maintaining the sanctity of your homes and surroundings ensures that you always receive the highest quality of maintenance and services, timely and consistently. Our preventive maintenance programme is smart and cost-effective in reducing the need for repair, thereby increasing the life of your household components and also conserving valuable energy.

General Services

Maintenance Services

Value-Added Services

24 Hour security

Access Control

Carpentry

Garbage Collection

Power Backup

Plumbing

Housekeeping

Elevators

Landscaping

Lighting

Routine Maintenance

Sewage Treatment

Water Supply

Water Pumps

Kitchen Summary

Living Room

Master Suite

Willow Farm Project Status Update on October - 2017
Villa # VDB Willow Farm Status Update on Type "A" Villas
A1 Staircase and balcony - SS railing glass fixing completed,
Car porch area ramp concrete completed,
External painting - final coat completed.
A2 Mock-up Villa,
A3 Landscaping & hardscaping completed,
Balcony tiling completed,
Electrical wiring completed. Switch plates fixing is underway,
Internal door fixing completed,
Internal painting (putty) is underway,
Car porch area tiling and ramp concrete completed,
Car porch slab waterproofing & screed concreting completed,
Servent toilet - Balance area plastering completed.
Staircase SS reailing fabrication works underway.
A4 Landscaping & hardscaping completed,
Balcony tiling completed,
Electrical wiring completed. Switch plates fixing is underway,
Internal door fixing completed,
Internal painting (putty) completed, sanding is underway.
Car porch area tiling and ramp concrete completed,
Car porch slab waterproofing & screed concreting completed.
Servant toilet - Balance area plastering completed.
A5 Main door ordered,
Marble polishing completed,
Private garden area demarcation and soil filling completed
Landscaping is underway,
Bedroom toilets tiling is underway,
Car porch area tiling and ramp concrete completed,
Car porch slab waterproofing & screed concreting completed.
External painting - base coat completed texture coat is underway.
A6 Internal painting - Second coat of painting underway,
Car porch area ramp concrete completed,
External painting - rear side painting completed. Front side completed.
All bathrooms counter slab fixing work conpleted.
Lift switches fixing and lift commissioning is underway.
All toilets CP fixing work underway.
Solar water heater fixing completed.
A7 Interiors works is underway,
Landscaping & hardscaping is underway,
Car porch area ramp concrete completed,
Lift switches fixing and lift commissioning is underway.
Solar water heater fixing completed.
A8 Plumbing works completed,
Landscaping works is underway,
Granite fixing for entry steps completed,
Balance area stacking stone works completed,
External primer is underway,
A9 External primer completed,
Internal painting - putty is underway,
External plumbing work completed,
Granite fixing for the deck area completed,
Granite fixing for entry steps completed,
MS trellis fixing completed,
C - Channel fixing for the elevation completed.
A10 External primer completed,
Internal painting -putty is underway,
External plumbing work completed,
Granite fixing for the deck area completed,
Granite fixing for entry steps completed,
C - Channel fixing for the elevation completed.
A11 Internal plastering completed,
External plumbing works completed,
Granite fixing for entry steps is underway,
MS trellis fixing is underway,
A12 External plastering completed,
Balance internal plastering near staircase areas is underway,
MS trellis fixing is underway,
Granite fixing for entry steps completed,
C - Channel fixing for the elevation completed.
Terrace floor and all balconies waterproofing work in underway,
A14 Internal plastering near staircase completed,
External plastering completed,
Granite fixing for entry steps completed,
External plumbing works is underway,
C - Channel fixing for the elevation completed.
A15 Internal plastering completed,
External plastering completed,
External plumbing works is underway,
Granite fixing for entry steps completed,
C - Channel fixing for the elevation completed.
A16 Interiors works is underway,
CP & Sanitary fittings fixing completed,
Toilets mirror fixing is underway,
Rear side balance area landscaping completed,
Car porch area ramp concrete completed.
Wet kitchen and dry kitchen cabinet fixing work completed.
All bedrooms wardrobes fixing work completed,
Lift switches fixing and lift commissioning completed.
Solar water heater fixing completed.
A17 First floor & second floor block masonry work completed,
Electrical conduiting is underway,
Internal plastering for terrace headroom is underway.
External plastering - 90% completed,
C - Channel fixing for the elevation completed.
External primer coat is underway.
A21 Footing excavation completed. Soil dressing and slush removal is underway,
Footing PCC is underway,
Reinforcement steel for columns, footing is underway.
A22 Footing excavation completed. Soil dressing and slush removal is underway,
Footing PCC is underway,
Reinforcement steel for columns, footing is underway.
Simplex # VDB Willow Farm Status Update on Type : "D" Blocks
D1 Front block entrance door fixing completed,
Electrical wiring & switch plates fixing for unit 001, 302 completed. Switch plates fixing is underway for unit no. 102,
Power testing completed for unit no. 302,
Internal doors fixing for unit no. 201 completed.
Balcony SS railing - glass fixing completed for unit no 302, 101
False ceiling works in toilets completed for unit no. 102.
Common area acid wash cleaning, grouting completed.
Common area switch plates fixing completed,
D2 D2-001 - UPVC windows fixing completed, internal painting (putty) is underway, main door fixing completed and polishing is underway, flooring acid wash cleaning is under way.
D2-302 kitchen cabinets fixing work completed, counter slab fixing completed, kitchen area cladding completed.
cond floor projection slab waterproofing completed,
D2-002 - Rear side landscaping work is underway.
D2-201 kitchen area flooring tiling work completed.
Duplex # VDB Willow Farm Status Update on Type : "C" Blocks
C1 UPVC windows fixing in unit no. 001, 002, 201 & 202 is underway,
External painting - stone wall texture paint is underway,
Common area lobby and staircase - granite floor fixing completed,
All toilets waterproofing and screed concrete for unit 202 completed,
Balcony waterproofing for unit 202 is underway,
Marble flooring for unit 202 completed.
C2 Common area lobby and staircase - granite floor fixing completed,
UPVC windows fixing in unit no. 001, 002 & 201 completeds,
C2-202 - Internal painting - primer and emulsion both completed,
C2-202 - Electrical wiring & switch plates fixing completed. Power testing is underway,
C2-202 - Internal doors fixing completed,
C2-202 - Electrical shaft near master bedroom dress area Block masonry and plastering completed,
C2-202 - Staircase and balcony SS railing Fabrication works is underway.
C3 Rear side podium slab waterproofing is underway,
Primer for stone wall completed,
Common area lobby & staircase granite fixing completed,
Common area MS railing fixing is underway,
Block external painting (texture coat) is underway.
Front side planter box waterproofing is underway,
C4 Common area staircase MS railing fixing completed,
Common area lobby granite flooring & cladding completed,
C4 - Front side deck area waterproofing and granite fixing completed, internal painting (putty) is underway, balance area tiling completed, terrace parapet wall block masonry & plastering completed.
C5 Front side landscaping works completed,
C5 - Final coat of painting is underway, staircase & balcony SS railing glass fixing is completed, cabinets fixing completed.
C5 - 202 - Staircase and balcony glass has been ordered, balance CP & sanitary completed, counter slab cutting and polishing in under way
Basement VDF flooring completed.
C6 Granite cladding in the common area is completed.
Basement VDF flooring completed.
C7 Granite cladding in the common area is completed.
Basement VDF flooring completed
FF, SF, TF toilets and balcony water proofing work is under way.
C8 Front side landscaping completed,
C8-002 - Interior works is in progress,
Front block entrance door fixing completed,
C8 Block - Common area UPVC balance windows is under production,
C8-202 - Power testing and final cleaning is underway.
Basement VDF flooring completed.
VDB Willow Farm - Status Update on : Entrance Portal
Landscaping works completed, balance area kerb stone fixing for the pavement area completed.
VDB Willow Farm - Status Update on : Landscaping
D1 & D2 Block: Landscaping works is underway. For Villas A01, A03, A04, A06 & A16, landscaping completed. Block front side landscaping between blocks C5 to C8 completed. Landscaping for front side planter in block C4 is underway.
VDB Willow Farm - Status Update on : Club House
Retaining wall shuttering & concreting for the second lift is underway. Water proofing works for retaining wall for the first lift of concrete completed. Balance area footings - excavation and concreting completed. Backfilling around retaining wall (east and west side) completed
VDB Willow Farm - Status Update on : Water Treatment Plant (WTP)
C2 & C5 Block - WTP equipments installation and commissioning completed. Hydro pneumatic pumps fixing, commissioning & testing completed.
VDB Willow Farm - Status Update on : Amphitheatre
Landscaping works completed. Pathway granite laying completed. Plants fixing completed. Electrical conduiting completed and light fixing is completed.
VDB Willow Farm - Status Update on : Park Extension (Senior Citizen's Lounge)
Landscaping completed. Pathway pavers laying is underway. Plants fixing completed. Electrical conduiting completed. Lights fixing completed.
VDB Willow Farm - Status Update on : Cricket pitch/ Cricket practice net
Pavement for the pathway is underway. Landscaping work completed.
VDB Willow Farm - Status Update on : Basement
Blocks D1 & D2 Basement VDF concrete work completed. Car park layout marking is underway. Blocks C1 & C2 basement walls, columns painting completed. For blocks between C3 to C8, VDF concrete works completed.
VDB Willow Farm - Status Update on : Electrical Cabling
Underground electrical cable trench excavation and hume pipe laying completed. Inspection chamber construction completed. All the LT & HT cables received at site and cable laying for the blocks between D1, D2, C1, C2, C3 and C8 completed. Airtel - OFC cabling for data, telephone & intercom completed. Testing and commissioning complete. Airtel broadband connection is provided to unit D2-302.
VDB Willow Farm - Status Update on : Main Road Pavement
Pathway pavers fixing completed for Blocks - D1, D2, C1 & C2. Pavers fixing completed for blocks between C3 and C8 completed. For villas between A01 and A14 pavers fixing completed. Main road cross pavers laying work completed.

Location Map


MASTER PLANS


Site Plan


Floor Plan


C Image


D Image

Listing Inquiry